Slimaco Who it’s for For operations and production

Instructions, agreements and plant status in one place, not in the shift supervisor’s head

Slimaco brings together work instructions, process sheets, quality procedures and meeting agreements. Agents prepare the morning order status, draft instructions and 8D reports, and the manager reviews and approves.

How do we change over press P5? Call Zbyszek, he knows.

Sound familiar?

  • Instructions are in binders, on drives and in the heads of a few experienced people.
  • The manager starts the day by collecting order statuses from emails, spreadsheets and phone calls.
  • An 8D report means searching for data in several places while the customer waits.
  • Agreements from production meetings get lost, and the same topics come back every week.

What Slimaco takes over

  • An employee asks about an instruction or a parameter and gets an answer with the document and version.
  • Every morning an agent collects order statuses and delays and sends managers a list of risks.
  • For a complaint, an agent drafts the 8D report in your template, with the history of similar cases.
  • Meeting agreements go to the responsible people as tasks, with a deadline.

To start: production knowledge and the morning order status. We measure the number of questions to the most experienced people and the reaction time to delays.

AI agents

Operations and production usually start with these agents

Agents follow your company’s rules, in the apps you already use. Where it matters, they wait for a person to approve.

Scheduled · daily at 8:00 am

Morning order status

  1. Collects task statuses from Jira and Asana
  2. Adds deadline changes reported by suppliers by email
  3. Sends managers a short summary with a list of risks
  4. Control: The summary goes only to the team
ResultEveryone knows what’s delayed before someone calls to ask.
AppsJiraAsanaOutlook
On demand · the quality team forwards the complaint

Quality complaint (8D)

  1. Collects the customer complaint, batch number and description of the nonconformity
  2. Finds similar nonconformities and corrective actions from the past
  3. Prepares a draft 8D report with proposed actions
  4. Approval: The quality manager completes and approves the report
ResultThe 8D report starts from the company’s history, not from a blank page.
AppsOutlookMicrosoft 365
On demand · the process engineer names the workstation

Work instruction from documentation

  1. Collects existing instructions, process sheets and meeting notes for the workstation
  2. Drafts a step-by-step instruction in the company template
  3. Flags differences between documents and gaps to fill
  4. Approval: The process engineer reviews and approves the instruction. The new version goes into company knowledge
ResultThe instruction is built from what the company already knows, not from one person’s memory.
AppsMicrosoft 365OneDrive

Works in the apps you already use

OutlookMicrosoft TeamsOneDriveMicrosoft 365JiraAsana over 1,000 integrations

FAQ

Frequently asked questions

More answers in the knowledge base.

Does Slimaco connect to our ERP or MES?
It depends on the system; we agree on it during the demo. To start, the documents, emails and spreadsheets where instructions and statuses already live are enough.
Who approves instructions drafted by the agent?
The process engineer or the manager. Knowledge has versions and a change history, so you know which version applies and who approved it.
Does Slimaco read technical drawings?
No. The agent works with instructions, process sheets, procedures and notes. Drawings stay with the process engineer.
Where do we start?
With the instructions people most often ask the most experienced colleagues about, and with the morning order status.

Start for free

Try Slimaco on your own emails, documents and processes

In a week you’ll know whether Slimaco works in your company. You connect mailboxes and documents, describe your first task and check the result on your own data.

  • No card and no commitment
  • An account with unlimited users for 7 days, with a pool of 5,000 AI credits
  • Activation within one business day
  • Help with the initial setup

Request a trial account

The controller of the data from this form is STGR Sp. z o.o., ul. Marynarska 3, 60-480 Poznań, Poland. We process it to respond to your request and set up a trial account or demo (Art. 6(1)(b) and (f) GDPR). We use the Web3Forms service to send the form. Details and your rights are described in the privacy policy.